Custom packaging suppliers compared for small brands
How Packlane, Arka, Packhelp, PakFactory and Packrivo compare on minimum order, production time and the orders each handles best. Supplier terms checked October 22, 2026.
Comparison table
| Minimum order | Production time | Best for | |
|---|---|---|---|
| Packlane | Low minimums; no fixed number published | Most custom packaging 7–15 business days, plus shipping; rush on select products | Small first runs of mailers and folding cartons with instant online pricing |
| Arka | Branded mailers: 1 sample, then production from 10 units; custom cartons 250 units | Standard 7–10 business days, rush 3–5 business days, after proof approval | Very small branded mailer runs and fast standard production |
| Packhelp | Custom-size mailers 100 pieces (plus a die-cut fee from €240 net on the first order); custom-size product boxes 1,000 pieces | Set per order for custom sizes; standard sizes ship faster | Brands in Europe ordering printed mailers with EU delivery |
| PakFactory | Set per specification; no fixed minimum published | Rigid boxes 25–30 business days; folding cartons 15–20 business days, after final proof | Managed custom packaging projects with a dedicated product specialist |
| Packrivo | 500 pieces per design | Stock jewelry boxes 1–15 days; custom printed boxes about 5–30 days after approval | Custom jewelry, candle and gift packaging at 500+ pieces per design |
Detailed comparisons
Frequently asked questions
Which custom packaging supplier has the lowest minimum order?
Arka lists branded mailer production from 10 units and Packlane advertises low minimums, so both suit very small runs. Packhelp requires 100 pieces for custom-size mailers. Packrivo projects start at 500 pieces per design.
Which option is best for custom jewelry boxes?
Rigid jewelry boxes such as drawer, magnetic flip-lid and book-style boxes are usually made by specialist factories. Packrivo compares quotations from independent factories in China for these boxes from 500 pieces per design.
Sources
Supplier terms were checked on their own pages on October 22, 2026. Terms change; confirm current minimums, prices and timing with each supplier before ordering.
