

Inserts
MOQ: 500 pieces per product / design. Plan the quantity for each design in your brief.
Folded paperboard inserts position or display items inside a box.
Packaging option · Supplier confirmation required
MOQ 500 pieces per design.
Packrivo support: packaging sourcing, requirements preparation and supplier coordination.
Share the product dimensions, quantity, material or finish preferences and delivery destination. Feasibility, sample scope and costs, production timing and delivery terms are reviewed for your project before an order.
Send the product dimensions, quantity by design and destination. Include the structure, material and artwork preferences you already know; flag open questions so supplier quotes use the same scope.
Get a QuoteShare your dimensions, quantity and delivery destination.
The minimum is Packrivo’s project threshold. Availability for the chosen structure, material and finish is checked for your project.
The finished dimensions and usable interior determine material use and product fit.
Closures, folds and assembly steps change the work needed to make the pack.
Board, wrap and insert choices affect both construction and material cost.
Artwork coverage, colors and decoration steps change setup and finishing costs.
The quantity per design changes how setup and production costs are distributed.
It may suit lighter items, dividers or an interior display layout. A presentation insert alone does not prove transit protection.

Record the support folds, product contact areas and any printed face as separate fields. Use the actual product outline to decide where artwork can remain visible after loading.
Confirm board specification, fold behavior, slot tolerance, assembly and box fit. Review the assembled sample with the actual contents.
Final materials, construction, price, sample scope and delivery timing are confirmed for the agreed project with the relevant supplier.
It can be designed for display, positioning or instructions, but the insert job should be stated and confirmed through a drawing or sample.
No. This is an inquiry candidate. Material specifications, supplier feasibility, project price and timing and performance need project-specific evidence.